The Strange Pleasure of Self-imposed over-work

This last week I finally got around to replacing our very old roof on the Old School classroom. 129 years old in fact.

I have had it on my ‘to-do’ list for some years now, but I have always been too busy.

However, as I have been getting older and less virile, I realised that I needed to get on with it without too much delay.

We were getting a few drips in during heavy weather, but not too bad. Just enough to warn me that this needed to be treated as a priority.

Then the fire came and I suddenly realised that the roof was the weakest part of my bush fire protection. 

The old iron sheeting was coming loose from its screws and gaps were appearing in-between the over laps of the joints. This was also adding to the rusting and leaking.

Since the fire, I have been so completely focussed on re-building and getting back to my proper work of making beautiful things, that I had to ignore the pressing need to replace the roof.

Then the floods. We had more and larger leaks in the lounge room during the recent torrential rain events, so the roof had to be dealt with.

I had asked my friend Andy, who is a very skilful builder, to give me hand to replace the roof, as I wasn’t at all confident to be up on the 6 metre scaffold and then onto the 30 degree pitch of the roof.

Just a few months before the fire I had single handedly replaced the north face of the old pottery roof over 2 days, replacing the roofing batons and the insulation as well.

But that was then. I have lost a bit of confidence up on roofs and ladders since then with all that I have been through. It’s shaken my self confidence. I think that the experience of the fire has aged me.

Particularly the episode of climbing into the big pine tree up 7 or 8 metres to chain saw off the burning branches over hanging the house during the fire.

I haven’t been the same man since. It took something out of me that day and I haven’t been able to recover it.

Anyway, Andy said that he would help me out, but not during the summer, when it would be too hot for roof work, so last week was the time. He had a few days free. 

I had ordered all the materials a few weeks beforehand, and I also asked my neighbour Larry to give us a hand, as it is good to have someone on the ground to pass things up when the ladder is 6 metres up and down. Over the years I have had Larry over here occasionally. I taught him to Mig weld and on several occasions he has brought sheet metal jobs over here for me to cut up in the guillotine and bend in the pan break etc. We have developed a barter system of swapping labour on jobs that we can’t do alone.

Over 3 days from Monday to Wednesday, we built the scaffolding, stripped the old roof in sections, insulated the ceiling with more insuwool batts, Checked the old roofing timbers and structural joints. Which turned out to be amazingly sound and better quality than any modern-day, fresh hardwood available for sale locally. I was really thrilled. It was such a solid build.

I had expected to have to replace the batons at least. We improved the structure by bolting the timber roof batons onto the rafters as a safety precaution, as those 129 year old nails were starting to look a little rusty.

We ceiled the roof cavity with ‘anticon’ sheeting and fibreglass insulation, to bring the structure up to the current ‘BAL40’ Australian Standard bushfire fire-proofing. 

Then fixed new single length gal iron roof sheeting back onto the roof. By doing it in sections, the whole roof was never exposed all in one go. This was a precaution against any possible sudden change in the weather.

We were lucky. It didn’t really rain very much and the days were not too hot or too windy, so we finished most of the job in 3 days. 

There is still a lot more to do, but this was the most pressing and difficult part.

After climbing the 6m ladder 20 to 30 times a day carrying up all the materials and tools etc. My thigh muscles were screaming from over use, and it didn’t get any easier by day 3, but then we had Thursday off, as Andy had another appointment, so on the Friday as we did the flashing, the front ladder was so much lower to get onto the front verandah. That meant less ladder climbing, so my legs and knees were coping much better.

I fell into bed each night with a sense of relief, but also a hovering feeling of extreme tiredness bordering on exhaustion. All self inflicted and well earned. 

The trade-off for this minor pain is that I now have a roof that doesn’t leak in heavy rain, but most importantly, a roof that is better designed to survive the next catastrophic bush fire.

That’s a relief! I’m really too old for all this kind of ladder and roof work, but it just needs to be done.

The new roof has cost me about $5,000 in materials. I’m pretty sure that it would have cost me 4 times that much if I had got a roofing company to do it. Self-reliance has its strange pleasures.

The next job is to fire proof the timber end gables and under the eves to stop ember attack. 

But first I need a good rest. I have some big porcelain bowls in the damp cupboard that need turning. A change is as good as a holiday I’m told.