Kilns

I have now installed the double walled, stainless steel flue on my newly acquired 2nd hand kiln that I built and sold 26 years ago and have now bought back. I was able to buy the flue system parts, even during lock down, as I still have my old account with the company that makes the parts.

I had told the company that I was closing the account back in 2019, as I had arranged to sell the kiln company to my friend Andy. I even took Andy to meet the owners of all the companies that I did business with, and introduced him as the new owner. Regrettably, the fire burnt us out just 2 weeks before the sale was to be completed. So we had nothing to sell.

I rang the company this year and told them the sad tale and asked if I could re-establish the account , but with a new name – Steve Harrison. They agreed and the parts were sent by courier, no new paper work. They trusted me. After all, we had been doing business together for close to 40 years. I have re-activated all of my former accounts now to buy parts to re-build. In every case they agreed to give me my account back with a change of name to my name with no paper work involved. They all know me well enough. Trust is a beautiful thing. I appreciate it. But after more than 40 years of trading with them, I sort of expect it. After all, my account number with one supplier is 001 . Their first customer to open an account!

The new rule will be; No step ladder work after 70! I just need to get this done.

To comply with the Australian Standards for a kiln located indoors. I also had to make a couple of air vents. One at floor level and another at ceiling height to get good ventilation into the room.

The floor level vent is a wide and low format, louvered, and is screened with 16 gauge stainless steel mesh inside and out.

The upper level vent is of the same area, but this one is square. Louvered on the out side and meshed inside and out with the same 16 gauge stainless steel mesh.

It’s always a challenge to work on an extension ladder up at 5 metres these days, but no one else is going to do it. I was a bit concerned about installing it, and put it off for a few weeks, but due to the Lock-down, I can’t really get someone in to do it. Having left it for some time, waiting for the work fairy to turn up and do it for me. But yet another no-show. Maybe the work fairy is restricted by lock down too? So I finally got up the gumption and did it myself.

I had intended to install a large stainless steel hood over the electric kilns end of the kiln room, but due to lock down, I can’t get my hands on any stainless steel sheets, as there are no commercial stainless wholesalers within 5 kms of Balmoral Village.

Kilns fired on different fuels can’t share the same venting flue system, so LPG , Natural gas and wood, can’t co-habit, nor can you flue electric and fuel kilns together.

We have been gifted a small top loader electric kiln by Rohde. Thank you Rohde! The gift was organised by my friend Len Smith. Thank you Len!

As I can’t build a large flue canopy for the electric kiln at the moment. I have bodged up a temporary extraction fan in the window next to the kiln. It will do until I can build a proper one.

I made it so that it can be installed and removed easily and also used in the next window later on as a dust extractor when I’m making up glazes.

I made these two wooden blocks with rebates on both side, plus top and bottom, so that they can lock into the window frame and allow a sheet of plywood with the fan mounted in it to slide in and be held securely. While still being able to be removed easily. I even made them using wood that we grew, milled and dressed our selves.

We have done one test firing to dry the kiln out and establish the protective oxide layer on the elements. The kiln has a small tube fitting that allows the fumes from the kiln to be directed out of the room through ducting. (not supplied.) I have directed the vent fumes out the window through the fan. The vent is only 25mm dia. so I have used 90 mm dia. pipe to vent it out through the fan. This allows a massive excess of cold air from the room to mix with the vent fumes to cool them. allowing the use of plastic pipe. I’d prefer to use a gal steel pipe bend, but I don’t happen to have one. Maybe later.

To finish off everything in the kiln room, we have the LP gas Plumber coming this week to certify the gas line installation. If all that goes ahead, then All we have left to do is make up some test glazes and do a test firing full of glaze and body tests. Slow but positive progress.