Bonded

We have spent the last week working with our heritage bricklayers. The job progresses slowly and steadily. I spent the first half of the week working on the southern high arch window end wall.

Mid week I had to build a scaffold to allow the brickies to get higher.

On Thursday I got some help from our son Geordie and my good friend Colin the builder who came over for a couple of hour to help me erect the wooden arch former so as to facilitate support the arch bricks over the arch. I built the frame, but couldn’t hold it up safely while I secured it in place without help.

The brick work proceeded up the wall pretty quickly, so Colin and I spent Friday afternoon building the scaffolding up to the second level and securing it to make it very stable, then creating a safe ty rail around the top to make it safe for the brickies while they work up there next week.

While we worked on the end wall, the brickies worked under the verandah to keep the job moving along.

I secure the brick veneer wall to the corrugated ironed steel rail wall by using what are called ‘brick ties’. These are specially designed steel brackets that are screwed to the steel wall and are embedded into the cement mortar.

These are sold in boxes of 150 units. I am placing these ties on every 2nd brick, on every 3rd course of brick work. We are about half way through the job and we have used almost 4 boxes so far. I can see us using about 1,000 of these in total. Tragically for me, these things are made to secure the brickwork to a timber frame, so the hole in the tie to allow the nail or screw through is made too small for the big roofing screws that I’m using. So I have to spend half an hour a day drilling out the holes from 4 mm. to 6.5 mm.

To prevent any bricks being dropped onto the glass panes, I have screwed plywood panels onto the arch formwork supports and then covered the plywood with black builders plastic to keep it from getting wet in the rain that is forecast this coming week.

It’s all very tedious and takes so much time, but is so very necessary, as replacing a broken pane would take a longer time and cost more.

In chatting to Bill, one of the bricklayers, it turns out that he was taught by a master bricklayer, Dave Smith, who came from Leeds in Yorkshire. I tell him that my father was born in Leeds. Bill likes this bit of news and spends our next few ‘smoko’ breaks telling me all about his good ‘mate’ Dave. He even rings Dave up to tell him about the job, about our ‘Sussex bond’ variations, and about our Yorkshire/Leeds connection.

It also turns out that Bills brother Gordon, our other brickie, knows a lot of our friends here in the Highlands, as Gordon lived here for a decade in the 80’s. We discuss our connections and it turns out that we must have met 35 years ago, or if not, at least been at the same ‘open house’ music concerts.

It’s a small world. We are bonded by more than just bricks and mortar. We have the Sussex bond, the Leeds bond and the Open House music bond.