We have spent this Easter long weekend digging trenches and laying plastic ‘polypipe’ all around the perimeter of the property. We used to have a complete circumnavigation of the block, but it was largely destroyed in the recent fires. I laid about 1000 metres of polypipe in the 70’s, but having chosen to live here on a very low income, I buried all the pipe by hand using a mattock. I dug and buried about 6 metres every summer morning before breakfast over a few years.
My big mistake was that because the ground was very dry and hard, I only managed to bury the pipe just below the surface, possibly just 100 mm. deep. Over the years with mowing and soil disturbance, erosion, etc. some of the pipe was just visible in places. It wasn’t such a big deal for the first 40 years, it only turned out to be a mistake when the catastrophic fire roared through here.
When the fire came, it was so hot, that it melted the pipe where it was exposed, or even if it was close to the surface. After the fire we found 2 complete melt outs, and 15 leaks in the system. We spent a couple of days with our friends Warren and Trudie helping us, to locate and patch all the holes. Each day driving back into town to buy more joiners, junctions and piping. We were haemorrhaging a thousand dollars a day for the first few days. We knew where the holes were, because whenever I started up the pump, we could see a fountain appear out of the ground. So I would switch off the pump and dig out the wet soggy site, then cut out the damaged section of pipe and install a couple of joiners and a new length of pipe. It worked as a stop gap measure, it got us through a tough spot in the dangerous, hot, dry, summer. But now it has become the time to do the job properly.
I decided to re-route the new pipeline right around the extreme edges of the land, whereas previously, it had cut around the edges about 20 metres in from our boundary. Now I want to move the pottery up onto the orchard site and move the stone fruit orchard up to the front of our land close to the street. I don’t want to have to move the polypipe again. I need it to be out of the way, but accessible. This time I have dug the trench 300 to 400 mm deep. Not deep enough to have to worry about cutting through the electricity conduits where they criss-cross the block, 600mm. down, but deep enough not to melt in the next fire that will come through here in the coming decade.


Eventually, I got back to the old pipework and joined the old 44 year old imperial agricultural pipe into the new blueline metric piping. There have been 4 different ‘standard’ joints for this poly piping system and 3 different standards in pipe sizes and wall thicknesses over the years. My under-ground water system has elements of all 7 different parts. It’s a hotch-potch. Whenever I dig up a part of the system to add on a spur line, I have to try to match the parts and pipe sizes.

I used to have stock of all these different parts to get me out of trouble in 1inch, 25mm., 2 inch, and 50mm. sizes in both male and female formats. These days I have to drive down to Mittagong to buy each new part for the circumstances at hand. I usually buy one extra spare part to start to replace my parts in stock.
We will be safe for the next 4 years, as it takes 4 years for the leaf litter in the forest to build up to a level that will sustain a bad fire, somewhere from 5 to 10 years on, there will be another very dry, prolonged period, but global warming increases the likelihood that it could be worse than this last time. When the fire comes again we need to be better prepared. This is how we are thinking & planning, and how we are responding to this disaster. I need to make our property defendable in the next very bad fire.
While I was concentrating on digging and laying the 130 metres of new 50mm. dia piping, Dave the concreter turned up to start work on the concrete slab for the new metal framed car port. I thought that would give him a hand, but I soon realised that the best assistance I could give him was to keep out of his way. He has done this all his life and is very quick and efficient. One day to dig out the site and frame it up, the lay the steel rio mesh, and another day to cast the concrete and polish the surface. Straight after Easter, the builder turned up to start erecting the metal frame.


It’s all going so quickly now. We have finished excavating all the beautiful rich dark top soil from the orchard and spreading it on the new top site. We spent a day raking out the roots and stones from the top soil and loading the truck to take them to the burn pile.


I want to get this new orchard site ready for the arrival of the new dwarf fruit trees by June/July. The site has to be completed by then because these new fruit trees are going to be bare-rooted, and will need to be planted pretty quickly. They are already ordered and paid for. I won’t have time to be doing all this prep when they arrive. These little jobs have to be scheduled in all along the way as the opportunity arrises. I couldn’t bare to build the new pottery on top of all that hard earned, self created, beautiful rich top soil. I had to remove it and use it productively.
So now the site is prepared, we still have to lay in the irrigation. One of my new poly pipe spur lines terminates just inside where the orchard fence will be. I am still trying to figure out the cheapest way to build a fence and frame to support the bird netting. This is a work in progress. The next immediate job is to build a stone retaining wall to hold back the lovely deep bed of soil. Actually I need to build 2 stone retaining walls over the next few weeks to prepare for other stages of the new pottery build. The old orchard site that will house the new pottery will need to be levelled, what’s called ‘cut and fill’ and that soil will need to be retained. Whenever I can get around to that.
And the good news is…. Our Hyundai Ioniq electric plug-in hybrid car has returned the performance figures for the first quarter and we have raised our average fuel consumption from 500 km. to the litre of fuel up to 505 kms to the litre. It’s an amazing statistic that I find hard to comprehend, but I have only been to the service station one this year so far, and the fuel tank is still over 3/4 full. Very pleasing!
Lastly, we have been trying to find ways of using up our huge excess of capsicums. First they were roasted by the fire and lost their leaves, then recovered by the heavy rains that followed. Now we are having to deal with this huge harvest. Fortunately, capsicums are a favourite of ours, but everyone has a limit. We use them in every soup, salad, stew, and stock. I have roasted them and pickled them, this week I stuffed them and baked them. Last night I cut them into chunks and used them on kebabs with zucchini slices and some fresh tuna off the fish truck.


Janine made a baked pudding using 2 jars of our preserved berries from the summer.


As the weather has turned cooler now, this warming and very satisfying desert is very welcome and delicious .
I have made some sourdough bread. I rescued the sourdough starter from Geordie. Now that his restaurant has been forced to close. I thought that I might keep the sourdough ferment alive here for the duration.




You must be logged in to post a comment.