We spent the last week digging 150 metres of trenches. Digging all around the perimeter of the new shed and then down the hill to the big water storage tanks. These water tanks have not had any water flowing into them in 12 months, not since the previously pottery shed burnt down.



Fortunately, Our friends Stu and Robyn Have a half share in a trenching machine and we were able to borrow it for a while to do all the really heavy work, but there is still a lotto getting down on our hands and knees to d the clearing out and lifting difficult flat iron stone rocks that get in the way.
I almost got all the plastic piping installed before a big dump of rain. That put an end to our blur-glue plumbing work for a while. This week I am teaching a Master Class at the Hazelhurst Regional Art Gallery in Sydney, so there will be a weeks wait before I get back to the rather aromatic, acetone based, blue-glue and white plastic plumbing pipes.




Bit by little bit, we make slow progress. we got 120 metres of pipe in the ground before the storm stopped us. I’d have preferred to get it all done before this week-long teaching hiatus interrupted the work. However, I’m very pleased to get the gig. This will be the 8th year straight that I have taught this summer school MasterClass. I’m starting to run out of special techniques that students haven’t been exposed to previously. It has become my way of easing out of Xmas/New Year holiday mode and back in to clay work, but this year it’s more of an interruption to my labouring/building work.
It is strange in the extreme to realise that I have spent a whole year without making a pot. I haven’t touched clay since last years Master Class. This makes me more of a fraud than a master! However, I’m pretty confident that I will have the pottery built and fitted out by the middle of the year, or thereabouts. I’d really like to think that we could have new work for sale by the next ‘Open Studios’ Arts Trail event on the first two weekends of November.
Who knows? It’s a small ambition. But a lot of work to get there. The next step is to get the electricians in to do the first fix wiring. This has to be completed before we can insulate and line al the walls. The insulation and lining has to be completed before we can start to build shelves and benches etc. Then we have to rebuild our kilns…